Due to the significant risks associated with inadequate energy control procedures and the failure to properly implement effective energy control procedures, section 1910.147(c)(6)(i) REQUIRES that periodic inspections be performed AT LEAST ANNUALLY (based on twelve-month intervals) to VERIFY that

  1. the procedures are adequate and
  2. they are being properly applied

OSHA believes that these periodic inspections will, in part, ensure that the employees involved with LOTO are familiar with their responsibilities and that they maintain proficiency in the energy control procedures they implement.

NOTE: OSHA allows energy control procedures that are used less frequently than once a year (based on a twelve-month interval) to be inspected only when used.

These periodic inspections MUST contain at least two (2) components:

  1. an inspection of EACH energy control procedure, and
  2. a review of EACH employee’s responsibilities under the energy control procedure being inspected.

EACH energy control procedure required by §1910.147(c)(4) MUST be separately inspected to ensure that the energy control procedure is adequate and is PROPERLY implemented by the authorized employee(s) in accordance with the LOTO standard.

You have no rights to post comments

 
View 's profile on LinkedIn

 

 LinkedIn Group Button

facebookIcon

 

Partner Organizations

 Chlroine Institute Logo 100 years

I am proud to announce that

The Chlorine Institute and SAFTENG

have extended our"Partners in Safety" agreement

for another year (2024)

CI Members, send me an e-mail

to request your FREE SAFTENG membership

 

RCECHILL BW

  

kemkey logo

OHS Solutions logoCEMANE power association logo

 EIT LOGO

 

Member Associations

ASME logo

 

Screen Shot 2018 05 28 at 10.25.35 PM

aiche logo cmyk highres

Chlorine institute

 nfpa logo.5942a119dcb25

 

TOCAS

 

BLR Logo 2018

 

 

 

 

safteng man copy

 

 organdonor