Some companies develop an elaborate generic energy control procedure and supplement the generic procedure with checklists or appendices to address various distinct machinery and equipment in their facilities. This type of procedure and those described above may be considered a single energy control procedure (instead of multiple procedures) for inspection purposes if all of the criteria contained in this chapter on grouping the same or similar machines/equipment are met.

However, suppose checklists or appendices address machinery/equipment that does not use the same or similar control measures. In that case, the employer must divide machinery and equipment referenced in the checklists or appendices into groups, such that the machines/equipment in any group have the same or similar types of control measures.

Once this is accomplished, an employer may inspect and review the generic energy control procedure in conjunction with each distinct group of machines/equipment referenced in the relevant checklists or appendices.

You have no rights to post comments

 
View 's profile on LinkedIn

 

 LinkedIn Group Button

facebookIcon

 

Partner Organizations

 Chlroine Institute Logo 100 years

I am proud to announce that

The Chlorine Institute and SAFTENG

have extended our"Partners in Safety" agreement

for another year (2024)

CI Members, send me an e-mail

to request your FREE SAFTENG membership

 

RCECHILL BW

  

kemkey logo

OHS Solutions logoCEMANE power association logo

 EIT LOGO

 

Member Associations

ASME logo

 

Screen Shot 2018 05 28 at 10.25.35 PM

aiche logo cmyk highres

Chlorine institute

 nfpa logo.5942a119dcb25

 

TOCAS

 

BLR Logo 2018

 

 

 

 

safteng man copy

 

 organdonor