1910.303(g)(1): “Space about electric equipment. Sufficient access and working space shall be provided and maintained about all electric equipment to permit ready and safe operation and maintenance of such equipment.”

1910.303(g)(1)(i): “Working space for equipment likely to require examination, adjustment, servicing, or maintenance while energized shall comply with the following dimensions, except as required or permitted elsewhere in this subpart:…”

I have always been taught that main electrical disconnects (circuit breakers, knife switches, LOTO Points) must be kept clear according to Table S-1, etc., for many reasons (Electricians need to have maintenance access, you don’t want to have obstructions if you need to access the disconnect in an emergency, you need to be able to stand to the left side of the panel while throwing the breaker, you don’t want a forklift to hit the panel, etc.). I recently came across a situation where a colleague suggested that as long as they are not working on the equipment while energized, 1910.303 (g)(1) does not apply. I question this interpretation.

What about troubleshooting? We don’t require our people to perform LOTO prior to troubleshooting. Do you need clearance for troubleshooting?

What about an emergency when you need to throw the breaker? Do you need adequate clearance to access the emergency disconnect?

If the energy comes into the breaker box from the buss way (even after you’ve thrown the disconnect), do you need the clearance required by Table S-1 based on your proximity to the energy in the conduit from the buss to the breaker box? I would be interested to know how you guys interpret and apply this regulation in your facilities. Are there other codes/standards that would help to reinforce my argument, or is he correct in his interpretation?

MY RESPONSE...

Comments   

#1 sehinc 2011-04-18 18:17
Not only does OSHA require clearance so do the fire codes. Both NFPA and the IFC address clearance issues. There have been a number of fires caused by combustible/flammable material stored in front of or under electrical panels.

You have no rights to post comments

 
View 's profile on LinkedIn

 

 LinkedIn Group Button

facebookIcon

 

Partner Organizations

 Chlroine Institute Logo 100 years

I am proud to announce that

The Chlorine Institute and SAFTENG

have extended our"Partners in Safety" agreement

for another year (2024)

CI Members, send me an e-mail

to request your FREE SAFTENG membership

 

RCECHILL BW

  

kemkey logo

OHS Solutions logoCEMANE power association logo

 EIT LOGO

 

Member Associations

ASME logo

 

Screen Shot 2018 05 28 at 10.25.35 PM

aiche logo cmyk highres

Chlorine institute

 nfpa logo.5942a119dcb25

 

TOCAS

 

BLR Logo 2018

 

 

 

 

safteng man copy

 

 organdonor