The facility includes a Crude/Vacuum Unit ("CVU"). The CVU stores, handles, treats or otherwise processes a mixture of flammable substances, including methane, ethane, isopentane, propane, butane, isobutene and pentane. The CVU had an 8 inch piping elbow that failed, leading to the release of hot Vacuum Tower bottoms. The piping elbow used in the CVU was constructed of carbon steel, in a service that required chrome alloy construction. The use of carbon steel resulted in material failure leading to the release and fire. An additional factor leading to the release and fire was a thinned wall due to high- temperature sulfidation corrosion. Measurements taken after the fire revealed thickness readings near the failure point as low as 0.07, well below allowable levels. The refinery's post fire investigation concluded that poor quality practices and procedures were utilized when the elbow was installed in 1990 by the previous owner. Another carbon steel elbow was identified in the same piping circuit following the incident.

You have no rights to post comments

 
View 's profile on LinkedIn

 

 LinkedIn Group Button

facebookIcon

 

Partner Organizations

 Chlroine Institute Logo 100 years

I am proud to announce that

The Chlorine Institute and SAFTENG

have extended our"Partners in Safety" agreement

for another year (2024)

CI Members, send me an e-mail

to request your FREE SAFTENG membership

 

RCECHILL BW

  

kemkey logo

OHS Solutions logoCEMANE power association logo

 EIT LOGO

 

Member Associations

ASME logo

 

Screen Shot 2018 05 28 at 10.25.35 PM

aiche logo cmyk highres

Chlorine institute

 nfpa logo.5942a119dcb25

 

TOCAS

 

BLR Logo 2018

 

 

 

 

safteng man copy

 

 organdonor